Glass tagging, schedules and glazing documentation for curtain wall and storefront systems — coordinated with your fabrication and installation sequence.
Have a project that needs this scope? Send us the drawings.
Request a QuoteThese are representative concept studies and connection details, not client-branded project photography.
VL-D05
Representative connection / assembly study
VL-D07
Representative connection / assembly study
VL-D02
Representative connection / assembly study
Glazing documentation is where precision tagging matters most. We produce glass sketches based on frit patterns, tag every piece of glass across every drawing, and build the glass schedule and purchase order your supplier will fabricate from.
Confirmed glass type and glass bite requirements, whether measurements are in metric or imperial, and door/frame hardware specifications where applicable.
Every glass unit gets a unique tag that appears consistently across elevations, sections and the glass schedule — it's how the fabrication shop and installation crew match the right piece of glass to the right opening, and it's one of the most error-prone parts of a drawing set if done imprecisely.
Yes — glass purchase orders are prepared in both metric and imperial units as standard.
Yes. Glazing documentation is coordinated directly with the curtain wall and door frame detailing so tags, dimensions and bite requirements stay consistent across the full set.
Yes — glass sketches are prepared based on the specified frit pattern for each unit.
Ready to move forward?
Request a Quote